Evening Ya'll
Hope you had a great weekend,  back to work today after a 3 day weekend.  Installed the radiator, hoses, bled and adjusted the clutch hydraulics.  I'm neatly done with "Phase 1" of "JJ" oops, I mean "CD" ;-)  Thus far I've refurbished the interior, the front suspension, the cooling system, the front brakes, the steering rack and a few other things. 
|  | 
| The clutch mechanism just didn't seem right so I made a new rod for the clutch slave cylinder. I suspect that the clutch and throw out bearing are nearing the ends of their life. | 
|  | 
| Ready for coolant. | 
|  | 
| Hoses and wiring hooked up. | 
"That's All Folks"
Cheers,
Lynn
5hrs



 
I was away in San Antonio for a couple of days and didn't get to check the blog. Looking great!
ReplyDeletePS: I approve of the beer carton cardboard as a fluid leak catcher. I've done the same in my garage. :-)
ReplyDelete