Evening Ya'll
Hope you had a great weekend, back to work today after a 3 day weekend. Installed the radiator, hoses, bled and adjusted the clutch hydraulics. I'm neatly done with "Phase 1" of "JJ" oops, I mean "CD" ;-) Thus far I've refurbished the interior, the front suspension, the cooling system, the front brakes, the steering rack and a few other things.
The clutch mechanism just didn't seem right so I made a new rod for the clutch slave cylinder. I suspect that the clutch and throw out bearing are nearing the ends of their life. |
Ready for coolant. |
Hoses and wiring hooked up. |
"That's All Folks"
Cheers,
Lynn
5hrs
I was away in San Antonio for a couple of days and didn't get to check the blog. Looking great!
ReplyDeletePS: I approve of the beer carton cardboard as a fluid leak catcher. I've done the same in my garage. :-)
ReplyDelete